How it works
From your site to recycled material, with a certificate back to you.
Six stages, one point of contact and a paper trail for every load.
- Quote & schedulePer-panel price, freight included
- Pack & shipPalletized full truckloads
- Receive & weighCounted and logged on arrival
- Dismantle & separateFrames off, materials separated on our line
- RecoverMaterials returned to manufacturing
- CertifyCertificate for every load
Quote & schedule
Share the panel count, condition and pickup location, along with the module datasheet or model reference. We confirm a per-panel price, including freight, and book a pickup date.
Pack & ship
Stack panels flat on pallets and strap them. We send simple packing guidance. The number of panels per truck depends on module size and weight.
Receive & weigh
Each load is counted, weighed and logged on arrival, so what you shipped matches what you're billed and certified for.
Dismantle & separate
Frames and junction boxes come off first, then the panel runs through our recycling line, which separates the materials.
Recover
Recovered materials are sold back into manufacturing instead of going to landfill.
Certify
You receive a certificate of recycling for each load, ready for your compliance files.
How panels reach us.
Loads from any source are consolidated into full trucks.
Lean Recycle facilityMissouri City, TexasWhat we accept
Every load gets a certificate of recycling, so you have proof on file for regulators, landowners and auditors. Read about US regulations
